Episode 31 ~2:00 Low Current & ELV EN · العربية

Emergency lighting in KSA, and which document sets each number

In Saudi Arabia the duration and the lux come from the Saudi Building Code: at least 90 minutes for new buildings in every Civil Defense guide we read, and 11 lx average at the start with a required value that steps down to 6 lx. Civil Defense inspects against it. EN 1838 applies only when a specification names it, yet specifications often quote it instead.

A hospital corridor in a power failure, lit only by its emergency luminaires
Animated explainer, press play to watch the concepts now; the filmed cut publishes once production wraps.

What you'll walk away with

Four ideas to carry into the next specification conversation you have.

01

At least 90 minutes under the cited SBC provisions.

The five Civil Defense guides we read, for malls, offices, hospitals, hotels and high-risk plants, all quote the same clause of the Saudi code, §1008.3.4: not less than 90 minutes, from batteries or an on-site generator, with exit signs at §1013.6.3. That is the scope for new buildings, in the numbering the guides use; the SBC-2024 text itself is sold and we could not read it. A Civil Defense instructions page still states 2 hours and switch-on within 10 seconds, with no date and a defer-to-Civil-Defense clause, so confirm with the authority which applies to the project. For existing buildings the ICC base code allows 60 minutes (IFC 2012 §1104.5.1) and we have not read the Saudi text, so 60 is not ruled out there. A client, insurer or risk assessment may still require 180; that is stricter, not wrong.

02

The Saudi floor steps down over 90 minutes. EN 1838's does not.

SBC 801-2007 §8.6.4, the last Saudi text we could read, asks for 11 lx average and 1 lx minimum at floor level along the egress path at the start, and lets the required values fall to 6 lx and 0.6 lx by the end, within 40:1. EN 1838:2024 clause 4.1 states no average, only a 1 lx minimum that holds for the full rated duration at the end of the design life. Neither stops the actual output from falling; both set the floor it may not cross.

03

A 60-minute luminaire falls short of the cited 90.

IEC 60598-2-22 classifies and marks every emergency luminaire to its Annex B, and the classification ends with the rated duration in minutes. A product classified X 1 ABCEFG 60 (BSI test report 3873722 Rev 1, 2023) is 30 minutes short. Meeting the duration is not full compliance: the lux, the response time and the layout are separate checks, and a central battery system is judged on its autonomy, not on luminaire marking.

04

EN 1838:2024 lights the width, not the line.

Where a specification names EN 1838, name the 2024 edition. The 2013 text asked for 1 lx on the centre line and half that over the central band. The 2024 clause 5.1.1 counts 1 lx across the floor, excluding a border of a quarter of the width each side on routes up to 2 m and 0.5 m on wider ones; Annex B still checks diversity along the centre line. Clauses renumbered: escape route 5.1, open area 5.2, high-risk task 5.3.

START WITH THE CODE
Which document sets which number
ICCSaudi codeSBC 201 · SBC 80190 min · 11 lx falling to 6 lxIEC 60364Saudi codeSBC 401, chapter 56safety-service sources and circuitsCENwhen the specification names itEN 1838:2024 · EN 50172:2024the lux method, and the testsIECproduct standardIEC 60598-2-22:2021the luminaire, and its marked durationCivil Defense inspects against the Saudi code
EN 1838 is in neither family. It binds a Saudi project only when a specification names it, on top of the code.
READ THE MARKING
A 60‑minute luminaire falls short of the cited 90
Saudi code90 min, SBC §1008.3.4marked 6030 min shortmarked 18090 min to spare06090120180minutes of rated emergency operation
IEC 60598-2-22 classifies and marks every luminaire (Annex B). The code ends with its rated minutes; that number must reach 90.
THE SAUDI CURVE
The Saudi floor steps down over 90 min. EN 1838's floor does not.
SBC 201 / 801EN 1838:2024average along the route0612 lx0459011 lx6 lxEN 1838 setsno averageminimum at any point00.61.2 lx045901 lx0.6 lx0.4 lxminutes after the supply failsrequired minimums, not luminaire output;the line only joins the stated start and end
Meeting one can fail the other: EN 1838 sets no average, and the Saudi 0.6 lx allowed at minute 90 is below its 1 lx.
A hospital corridor in a power failure, lit only by its emergency luminaires

Emergency lighting × requirement × reference

Grouped by the document that binds. In Saudi Arabia that is the Saudi code first; a European standard applies on top of it only where a specification names it.

Requirement Threshold · timing Reference
Saudi Building Code, inspected by Civil Defense
Duration, egress lighting, new buildingsat least 90 min, in all five guides readSBC §1008.3.4, as quoted by Civil Defense
Duration, existing buildingsSaudi text not verified; the ICC base allows 60 minICC IFC 2012 §1104.5.1
Exit signslit at all times, 90 min on mains failureSBC §1013.6.3, as quoted by Civil Defense
Rooms on emergency powerelectrical, fire pump and generator rooms; public restrooms over 28 m²SBC §1008.3.3, as quoted by Civil Defense
Initial illuminance11 lx average, 1 lx minimum at floor levelSBC 801 (2007) §8.6.4; SBC Section 1008
End-of-duration illuminance6 lx average, 0.6 lx minimumSBC 801 (2007) §8.6.4; SBC Section 1008
Uniformitymax : min not above 40 : 1SBC 801 (2007) §8.6.4
Civil Defense instructions pageat least 2 h; on within 10 s; undated, defers to Civil Defense conditions998.gov.sa safety instructions §3-6/1, 3-6/2
Switch-on time, high-rise (2007 text)emergency systems within 10 sSBC 801 (2007) §5D.4.2.14.3
Test intervalsnot verified in the Saudi text we readSBC 801
Plan submissionemergency lighting and sign locations on the drawingsCivil Defense plan-submission guide, §4.5
EN 1838:2024, where a specification names it
Escape route illuminanceat least 1 lx on the floor, edge borders excludedEN 1838:2024 cl. 5.1.1
Room inter-reflectionsnot counted; the first reflection may count for qualifying indirect luminairesEN 1838:2024 cl. 4.1
Anti-panic illuminanceat least 0.5 lx over the core, 0.5 m border excludedEN 1838:2024 cl. 5.2
High-risk task illuminanceat least 10% of the task, never below 15 lxEN 1838:2024 cl. 5.3.2
Glare limit, escape routes500 cd below 2.5 m, up to 5000 cd above 4.5 mEN 1838:2024 Table 3
The luminaire and its tests
Response, escape route50% within 5 s, 100% within 60 sIEC 60598-2-22:2021 cl. 22.17.3
Response, high-risk task100% within 0.5 sEN 1838:2024 cl. 5.3.7; IEC 60598-2-22:2021 cl. 22.17.3
Duration markingrated minutes at the end of the classification codeIEC 60598-2-22 Annex B
Battery, rated duration over timerated duration for at least four yearsIEC 60598-2-22 cl. 22.7.8
Battery design life, one pack8, 6 and 4 years at a battery case up to 25, 35 and 45 °CTridonic data sheet 10/26-EM140-13 §8.5
Battery replacementwhen rated duration is no longer met after rechargeIEC 60598-2-22 cl. 22.6.10
Daily inspectionstatus indicators of central systems; recommended for self-contained ones; record faults onlyEN 50172:2024 cl. 7.4.2
Monthly testlong enough to see each lamp light, at most 10% of rated duration; 10% a month in total where short discharges harm the batteryIEC 62034:2012 cl. 5.1 · EN 50172:2024 cl. 7.4.3
Annual verificationfull rated duration plus the 7.3 b) to f) checks, logged; a 3 h test with up to 24 h recharge ends at hour 27IEC 62034:2012 cl. 5.2 · EN 50172:2024 cl. 7.4.4
Five-year verificationilluminance measured against the design minimumsEN 50172:2024 cl. 7.4.5
Logbookcommissioning, every check and test, defects, changes, who did themEN 50172:2024 cl. 7.2
For reference, US code10.8 lx avg and 1.1 lx min, falling to 6.5 and 0.65 lx over 1½ hNFPA 101-2024 §7.9.2.1.1 to .3
IF THE SPECIFICATION NAMES EN 1838
EN 1838:2024 lights the width, not the line
EN 1838:2013centre line: 1 lxcentral half: 0.5 lxEN 1838:2024central half: 1 lxouter quarter each sidenot countedroutes up to 2 m wide; above 2 m,the outer 0.5 m each side is not counted
The central half of a 2 m route now needs 1 lx, not 0.5 lx. Annex B still checks diversity on the centre line.
RESPONSE TIME
Half a second belongs to high-risk tasks only
0%50%100%0.5151060seconds after the supply fails50% at 5 s100% at 60 s100% at 0.5 sescape route, open areahigh-risk task only0.5 s belongs to high-risk task areas alone
Luminaire limits. A Saudi system may need 10 s: SBC 801‑2007 §5D.4.2.14.3 (high-rise), Civil Defense.
HIGH-RISK TASK AREAS
The high-risk number is a floor, not a percentage
015304560floor ends at 150 lx0150300450600normal lighting of the task, lxemergency lighting, during a power failure, lxrequired, the greater of the two10% of the taskbelow 150 lx the 15 lx floor governs, not the percentage
Two conditions and one answer: take whichever is greater.

What commissioning teams actually look at

Seven practical realities of emergency lighting that show up in audits.

0.5 s is the high-risk task time, not the escape-route time.

Escape routes and open areas must reach 50% of the required illuminance within 5 s and 100% within 60 s, the test IEC 60598-2-22:2021 clause 22.17.3 applies to the luminaire. The 0.5 s figure belongs to high-risk task area luminaires alone: control rooms, plant, kitchens, labs. Applying it to everything prices in a product nobody needed.

The Saudi numbers are the American ones, rounded differently.

Both come from the same foot-candles: 1 fc average and 0.1 fc minimum at the start, 0.6 fc and 0.06 fc at the end. SBC 801-2007 prints 11, 1, 6 and 0.6 lx; NFPA 101-2024 §7.9.2.1.1 and .2 print 10.8, 1.1, 6.5 and 0.65 lx. A Saudi specification should quote the Saudi text, even where the numbers nearly agree.

The high-risk number is a floor, not a percentage.

EN 1838:2024 clause 5.3.2: not less than 10% of the maintained illuminance for the task, and never less than 15 lx, with diversity of at least 1:10 (5.3.3). Below a 150 lx task the floor governs and the percentage is irrelevant. This is EN 1838's number. IEC 60598-2-22 is a luminaire product standard: it tests the luminaire and sets no illuminance for the space.

Maintained minimum, at end of life, direct light only, with one exception.

EN 1838:2024 clause 4.1: the requirements hold for the full rated duration to the end of the design life, the design uses direct light only, and room inter-reflections are not counted. The exception is indirect or uplight emergency luminaires: the first reflection may be counted if that surface is maintained as part of the emergency lighting and nothing ever obstructs the path to it (2013 text: clause 4.1.1, no exception). Clause 4.1 also requires a maintenance factor but prints no number; the 0.8 in spacing tables is the maker's assumption. A mains luminaire on an emergency conversion kit is in no spacing table; calculate it on its emergency lumens.

Height cuts the light directly below, fast.

One published self-contained bulkhead gives 3.28 lx directly beneath it at 2.5 m, 1.28 lx at 4 m and 0.57 lx at 6 m, the inverse-square law to two decimals. That describes the point directly below only. Spacing also depends on the luminaire's photometric distribution and the layout; this table spaces it 11.3 m, 9.6 m, then not at all at 6 m. Glare limits still apply: EN 1838:2024 Table 3 caps luminous intensity by mounting height, from 500 cd below 2.5 m to 5000 cd above 4.5 m, and the cap bites hardest in low corridors.

Heat spends the battery's design life.

Tridonic's LiFePO4 Accupack 3.3 Ah (data sheet 10/26-EM140-13, section 8.5) states 8 years of design life at a battery case temperature up to 25 °C, 6 up to 35 °C and 4 up to 45 °C. That is the case of the battery inside the fitting, not the room ambient, and it is years of service, not the 1, 2 or 3 hours one discharge must last. IEC 60598-2-22 clause 22.7.8 asks for the rated duration over at least four years.

The annual test leaves a recharge window.

EN 50172:2024 clause 7 sets the regime. Daily: check the status indicators of central systems (recommended for self-contained ones too). Monthly: simulate a mains failure long enough to see each lamp light; IEC 62034 clause 5.1 caps an automatic test at 10% of rated duration, 18 minutes at most for a 180 minute luminaire, and at 10% a month in total for batteries harmed by short discharges. Annually: the full rated duration plus the 7.3 b) to f) checks (indicators, monitors, cleanliness, inhibit and rest modes, obstructions). Every five years: measure the illuminance. Record it all in the logbook (7.2). In the illustrated case, a 3 h test followed by up to 24 hours of recharge ends at hour 27; full rated autonomy may be unavailable until then, so keep adequate emergency cover in every area through the test and the recharge. We did not verify test intervals in the Saudi text.

MOUNTING HEIGHT
Height cuts the light directly below, fast
2.5 m3.28 lxspacing 11.3 m4 m1.28 lxspacing 9.6 m6 m0.57 lxno spacingE = 3.28 x (2.5 / h)²directly below only: the table follows the inverse-square law
Directly below one published bulkhead: 3.28 lx at 2.5 m, 1.28 at 4 m, 0.57 at 6 m, the inverse-square law to two decimals. [13]
GULF HEAT
Heat spends the battery's design life
024688 years25 °C6 years35 °C4 years45 °CIEC floordesign life4 yearsbattery case temperature, upper limityears of service, not hours of emergency duration
Ask for the battery case temperature inside the fitting, not the room. At a 45 °C case this pack is at the 4-year floor.
TESTING
After a 3 h annual test, recharge can run to hour 27
a luminaire marked 180 minmonthly testlong enough to check, 18 min at most (10%)annual testup to 24 h recharge3 h discharge039152127hours from the start of the testin this example, full autonomy may not return before hour 27
Daily: central-system status (advised for self-contained). Every 5 years: measure lux.
Write this instead

The clause to write

Four lines, each naming a document, a quantity and a unit. None of them can be answered with an adjective.

a. SBC 201/801 Section 1008, current edition (values from the 2007 text): at least 11 lx average and 1 lx minimum at the start, 6 and 0.6 lx at 90 min, max:min 40:1 or less.

b. Self-contained luminaires to IEC 60598-2-22:2021, rated 90 min or more; a central supply, 90 min autonomy or more.

c. If EN 1838:2024 is also named, its values apply too.

d. Logbook and tests to EN 50172:2024 cl. 7: daily status, monthly function, annual full duration with checks, lux every 5 years.

A 90 min rating proves duration only. Line c is the one nobody writes: where a specification names EN 1838:2024 as well as the Saudi code, both sets of values apply, and the Saudi average and the EN minimum are checked separately.

Next Episode

Central battery systems (CBS)

Watch next

Get the next episode by email

Practical lighting know-how from NLC Academy. No spam, unsubscribe anytime.

By subscribing you agree to receive NLC emails.

Sources & further reading

Every number on this page, and the one document that sets it.